Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell Unity™ All Flash and Unity Hybrid Hardware Information Guide

Cabling the second optional DAE to extend back-end bus 0

Connect the second optional expansion DAE to the DPE expansion port 0 to extend back-end bus 0 (BE0) and designate this DAE as enclosure 1 of this bus. We refer to the address of this enclosure as BE0 EA1 (0_1).

About this task

Use the following illustration to complete this cabling task:

Figure 1. Example: DPE to 15-drive DAE
NOTE:When cabling the 15-drive DAE LCC SAS ports, ensure that the cables do not overlap behind the DAE. The illustration above demonstrates the proper method for cabling to the DAE LCC SAS ports.

Steps

  1. Label a pair of mini-SAS HD cables using the orange labels shown here.
    Expansion port cable labeling details Primary port cable labeling details
    Label part number Label Port Label part number Label Port
    046-001-561 SP A SAS 0 046-021-010 LCC A Port A
    046-003-489 SP B SAS 0 046-021-011 LCC B Port A
  2. Connect DPE port 0 to the new DAE to extend BE0.
    1. Connect port 0 on SP A in the bottom slot in the DPE to port A on the link control card A (LCC A) at the bottom of the DAE. []
    2. Connect port 0 on SP B in the top slot in the DPE to port A on the link control card (LCC B) at the top of the DAE. []

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\