PowerFlex: Client IO Errors When Replication Is Being used
Summary: Client/servers are experiencing IO errors against PowerFlex-backed devices. The overall backend (MDM/SDSes) appears to be healthy. PowerFlex replication is being used and there are some RPO errors against 1 or more of the RCGs. ...
Symptoms
- No degraded or failed capacity
- No SDSs decoupled or SDS devices reporting errors.
- No disconnected MDMs
The replication feature is being used.
One or more alerts in the UI reporting the following errors:
Major - The RCG consistent image is too large to be consumed by the destination in one piece. Minor - Remote Consistency Group RPO ExceededMDM event logs may report the following:
2024-06-11 15:55:56.592000:0001566:RPL_PD_CAP_UTILIZATION_MINOR WARNING Protection Domain ID <pd_id> Replication journal capacity is at MINOR utilization level 2024-06-11 16:20:12.848000:0001567:RPL_PD_CAP_UTILIZATION_MAJOR ERROR Protection Domain ID <pd_id> Replication journal capacity is at MAJOR utilization level 2024-06-11 17:19:57.272000:0001584:RPL_PD_CAP_UTILIZATION_CRITICAL CRITICAL Protection Domain ID <pd_id> Replication journal capacity is at VERY_HIGH utilization level 2024-06-11 17:52:26.352000:0001585:RPL_PD_CAP_UTILIZATION_CRITICAL CRITICAL Protection Domain ID <pd_id> Replication journal capacity is at CRITICAL utilization level ... 2024-06-11 16:25:14.381000:0001576:RPL_CG_MOVED_TO_SLIM_MODE INFO Replication Consistency Group ID <rcg_id> entered slim mode 2024-06-11 18:27:29.738000:0001586:SDR_CRITICAL_CAP_CHANGE ERROR SDR ID <sdr_id>) handling user data changed discarded old user data and stopped to accumulate new user data due critical capacity
Impact
Clients are unable to access volumes that are intercepted for replication.
Cause
Resolution
|
A rolling restart of all SDR components is required, and the MDM ownership on the source system must be switched to resolve the issue. Restart SDR components: 1) Identify all the SDRs: scli --query_all_sdr 2) Enter maintenance mode on the SDR: scli --enter_sdr_maintenance_mode --sdr_name <name> 3) Validate that the SDR is fully in maintenance mode by running the command in step 1. 4) Restart the SDR component. pkill sdr 5) Repeat this for all SDRs on the source site. Once all SDRs are restarted, switch the MDM ownership: #3.x scli --switch_mdm_ownership --new_master_mdm_name <name> #4.x scli --switch_mdm_ownership --new_primary_mdm_name <name> *If wanted, the ownership can be transferred back to the original MDM server. Until the cause can be determined, it will also be recommended that all RCGs on the source system be terminated. If the IO errors continue after applying the above steps, engage PowerFlex Engineering. |
Additional Information
Impacted Versions
PowerFlex 3.x
PowerFlex 4.x
Fixed In Version
PFMP 4.5.3