Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell EMC Open Networking Troubleshooting Guide March 2019

PDF

Boot processes

After the BIOS or U-Boot hardware verifications, POST tests run to verify the CPU and memory prior to booting the system software.

  • NOTE: The N1108EP-ON switch is a U-Boot-based platform.

After POST testing, there are three additional types of diagnostic tools you can use for testing your system.

  • Manual diagnostic boot process — To run additional testing, manually download and run the EDA tool. The EDA tool reports and logs pass/fail results.
  • ONIE with EDA — EDA is installed; you do not have to manually download the tool. Select the diagnostic option at boot-up. You can run this tool without a management interface.
  • Autorun EDA — EDA is installed; you do not have to manually download the tool. Select the diagnostic option at boot-up. You can run this tool without a management interface. The system always launches EDA in Quick Test mode to verify the hardware components before loading the software. If there is a failure at boot-up, based on the EDA configuration, the software may or may not continue the boot process.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\