Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell EMC PowerEdge C6420 Installation and Service Manual

Installing the fabric and sideband cables

Prerequisites

NOTE In a sled which has been configured with mixed CPUs – a fabric processor installed in the CPU2 socket and a non-fabric processor installed in the CPU1 socket, you must connect the external Omnipath link cables to Port 2 on the OCP carrier card.
NOTE The procedure to install the carrier card is similar to installing an OCP card.
NOTE Route the fabric cable for CPU2 under the heat sink of CPU1.
  1. Follow the safety guidelines listed in Safety instructions.

Steps

  1. Align the notches on the fabric connector with the guide pins on the processor base plate.
  2. Push the connector toward the processor, until the connector is engaged with the edge connector on the processor.
  3. Push the locking bar down to secure the fabric connector in place.
  4. Insert the side band cable into the respective connector, and press down to lock the connector.
    Figure 1. Installing the fabric and sideband cables
    This image shows installing the fabric and sideband cables

Next steps

  1. Install the air shroud.
  2. Follow the procedure listed in After working inside your system.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\