Always follow electrical safety precautions
to avoid injury and damage to Storage Center equipment.
NOTE Disconnect power from the storage system when
removing or installing components that are not hot-swappable. When
disconnecting power, first power down the storage system using the storage
client and then unplug the power cords from the power supplies in
the storage system and storage system.
Provide
a suitable power source with electrical overload protection. All Storage Center components must be grounded
before applying power. Make sure that a safe electrical earth connection
can be made to power supply cords. Check the grounding before applying
power.
The plugs
on the power supply cords are used as the main disconnect device.
Make sure that the socket outlets are located near the equipment and
are easily accessible.
Know the
locations of the equipment power switches and the room's emergency
power-off switch, disconnection switch, or electrical outlet.
Do not work
alone when working with high-voltage components.
Use rubber
mats specifically designed as electrical insulators.
Do not remove
covers from the power supply unit. Disconnect the power connection
before removing a power supply from the storage system.
Do not remove
a faulty power supply unless you have a replacement model of the correct
type ready for insertion.
Unplug the storage system chassis
before you move it or if you think it has become damaged in any way.
When powered by multiple AC sources, disconnect all power sources
for complete isolation.
Data is not available for the Topic
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please select whether the article was helpful or not.
Comments cannot contain these special characters: <>()\