Přeskočit na hlavní obsah
  • Vkládejte objednávky snadno a rychle
  • Zobrazit objednávky a sledovat stav expedice
  • Vytvořte a přistupujte k seznamu svých produktů
  • Spravujte své profily, produkty a kontakty na úrovni produktů na stránkách Dell EMC pomocí správy společnosti.

Active System Manager Release 8.2 Installation Guide

PDF

Prerequisites for Rack Server, S5000, Brocade and Compellent

The following table describes the prerequisites for the FCoE solution offered using Rack Server, S5000, Brocade and Compellent. For more information, see http://en.community.dell.com/techcenter/extras/m/white_papers/20387203

Table 1. Prerequisites for Rack Server, S5000, Brocade and Compellent
Resource Prerequisites
S5000
  • DCB needs to be enabled.

  • VLT needs to be disabled.

  • Enable Fibre Channel capability and Full Fabric mode.

    feature fc
  • Enable FC ports connecting to Compellent storage array and FC ports connecting to other S5000 switch via ISL links.

    interface range fi 0/0 - 7
                                                          no shut
                                                       
  • Create DCB Map.

    dcb-map SAN_DCB_MAP
                                                          priority-group 0 bandwidth 60 pfc off
                                                          priority-group 1 bandwidth 40 pfc on
                                                          priority-pgid 0 0 0 1 0 0 0 0
                                                          exit
                                                          
                                                       
  • Create a FCoE VLAN.

    interface vlan <VLAN ID> [Create VLAN for FCoE]
                                                          exit
                                                          
                                                       
  • Create FCoE Map.

    fcoe-map default_full_fabric
                                                          fabric-id <FCoE VLAN ID> vlan <FCoE VLAN Id>
                                                          fc-map <FC MAP>
                                                          exit
                                                       
Brocade
  • Alias needs to be created having Compellent fault domain WWPN accessible on Brocade switch. Create a single alias including the virtual ports for the Compellent fault domain, WWPN accessible on Brocade switch. ASM automates the creation of each additional zone for the server objects and place them into a zone config.
  • Brocade root password needs to be changed so that the banner presented to change the default password does not impact ASM's ability to ssh into the switch.
Compellent

Fault domain need to be created as per Compellent best practices.


Hodnoťte tento obsah

Přesné
Užitečné
Snadno srozumitelné
Byl tento článek užitečný?
0/3000 characters
  Zadejte hodnocení (1 až 5 hvězdiček).
  Zadejte hodnocení (1 až 5 hvězdiček).
  Zadejte hodnocení (1 až 5 hvězdiček).
  Vyberte, zda vám článek pomohl či nikoli.
  Komentáře nesmí obsahovat tyto speciální znaky: <>() \