Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell EMC PowerSwitch S5048F-ON Installation Guide December 2019

PDF

Two-post flush-mount installation

NOTE: : For more installation instructions, see the installation labels attached to the rail assembly.

  1. For this configuration, remove the castings from the front side of each ReadyRails assembly, see item 1. Use a Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch casting. Retain the castings for future rack requirements. Do not remove the back latch castings.
    Figure 1. Two-post flush-mount configuration
    Illustration of the two-post center-mount threaded round-hole installation
  2. Attach one rail to the front post flange with two user-supplied screws. See item 2.
  3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws. See item 3.
  4. Repeat this procedure for the second rail.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\