-
CUSTOMER STORIES
AI inspections at the edge increase railroad safety
Intel® Xeon® Platinum Processor
-
-
CustomerDuos Technologies
IndustryTransportation & Warehousing
LocationUnited States
-
-
-
Vision
Global demand for passenger and freight trains is expected to more than double by 2050 due to railroads’ low carbon emissions. To help railroads improve efficiency and scalability, Duos Technologies built a trackside portal using AI to inspect trains traveling over 125 mph and flag any rail car issues in real-time.
-
-
-
Solution
Duos partnered with Dell Technologies and built the Railcar Inspection Portal (rip®) with Dell PowerEdge servers. The trackside data center runs AI algorithms at the edge that inspect 360-degree images of every car in a train as it travels through a rip®. PowerEdge servers also enable AI model training in a central data center.
-
-
-
Impact
The rip® accurately inspects trains in real time without requiring them to slow down, enabling railroads to improve safety, operational efficiency and their ability to scale to meet growing demand. By building its solution with Dell Technologies, Duos delivers mission-critical reliability and drives innovation.
-
-
-
Business Results
-
-
-
How Duos Technologies Leveraged Dell Technologies
-
Dell Edge Solutions
Streamlining operations and driving insights where and when you need them at the edge.
-
Dell PowerEdge Servers
Accelerating transformation with PowerEdge servers that adapt and scale to business needs.
-
Dell PowerVault Storage
Delivering enhanced storage performance, expandable capacity and simple integrated management.
-
Dell PowerSwitch
Ensuring architectural agility and flexibility where needed — from the edge to the core and cloud.
-
Dell ProSupport Plus
Providing enterprise-level support for systems that power your critical applications and workloads.
-