Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell Storage Center SCv2000 and SCv2020 Storage System Deployment Guide

PDF

Add an SC100/SC120 Expansion Enclosure to the B-Side of the Chain

Connect the expansion enclosure to one side of the chain at a time to maintain drive availability.

  1. Disconnect the B-side cable (shown in blue) from the expansion enclosure: bottom EMM, port B. The A-side cables continue to carry IO while the B-side is disconnected.
    Figure 1. Disconnect B-Side Cable from the Existing Expansion Enclosure Disconnect the B-side cable that connects the top to the existing .
    1. Storage system
    2. Storage controller 1
    3. Storage controller 2
    4. Expansion enclosure 1
    5. New expansion enclosure (2)
  2. Use a new SAS cable to connect expansion enclosure 1: bottom EMM, port B to the new expansion enclosure (2): bottom EMM, port A.
  3. Connect the B-side cable that was disconnected in step 1 to the new expansion enclosure (2): bottom EMM, port B.
    Figure 2. Connect B-Side Cables to the New Expansion Enclosure Connect the B -side cables to the new .
    1. Storage system
    2. Storage controller 1
    3. Storage controller 2
    4. Expansion enclosure 1
    5. New expansion enclosure (2)

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\