Treceți la conținutul principal
  • Plasaţi comenzi rapid şi simplu
  • Vizualizaţi comenzile şi urmăriţi starea transportului
  • Creaţi şi accesaţi o listă cu produsele dvs.
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

Dell PowerEdge FN I/O Module Configuration Guide 9.10(0.0)

PDF

Getting Started

This chapter describes how you start configuring your system.

When you power up the chassis, the system performs a power-on self test (POST) during which the route processor module (RPM), switch fabric module (SFM), and line card status light emitting diodes (LEDs) blink green. The system then loads the Dell Networking operating system. Boot messages scroll up the terminal window during this process. No user interaction is required if the boot process proceeds without interruption.

When the boot process completes, the RPM and line card status LEDs remain online (green) and the console monitor displays the EXEC mode prompt.

For details about using the command line interface (CLI), refer to the Accessing the Command Line section in the Configuration Fundamentals chapter.


Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\