In the Home topic, select
Action > Manage Schedules.
Select the schedule to modify. The schedule settings appear at the bottom of the panel.
If you want to replicate the last snapshot in the primary volume, select the
Last Snapshot check box.
The snapshot must exist at the time of the replication. This snapshot may have been created either manually or by scheduling the snapshot.
NOTE:This option is unavailable when replicating volume groups.
Specify a date and a time in the future to specify when to run the scheduled task. This date and time is also the starting point for any specified recurrence.
To set the
Date value, enter the current date in the format
YYYY-MM-DD.
To set the Time value, enter two-digit values for the hour and minutes and select either
AM, PM, or
24H (24-hour clock).
If you want the task to run more than once, select the Repeat check box.
Specify how often the task should repeat. Enter a number, and select the appropriate time unit. Replications can recur no less than 30 minutes apart.
To allow the schedule to run without an end date, clear the
End check box. To specify when the schedule should stop running, select the
End check box
To allow the schedule to run at any time, clear the
Time Constraint check box. To specify a time range within which the schedule can run, select the
Time Constraint check box.
To allow the schedule to run on any day, clear the
Date Constraint check box. To specify the days when the schedule can run, select the
Date Constraint check box.
Click
OK.
The schedule is modified.
Click
OK.
Data is not available for the Topic
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please provide ratings (1-5 stars).
Please select whether the article was helpful or not.
Comments cannot contain these special characters: <>()\