Skip to main content
  • Place orders quickly and easily
  • View orders and track your shipping status
  • Enjoy members-only rewards and discounts
  • Create and access a list of your products
  • Manage your Dell EMC sites, products, and product-level contacts using Company Administration.

PowerProtect Data Manager 19.13 Cyber Recovery User Guide

Managing scheduled reports

The Scheduled Reports page lists the report schedules.

Prerequisites

A report schedule has been created using the Reports wizard.

Steps

  1. From the Main Menu, click Reports > Scheduled Reports.
    The page lists report schedules that you created using the wizard.
  2. To run a scheduled report on demand:
    1. Select a report schedule.
      You can select only one report at a time.
    2. Click Run Now.
    3. Click View Report in the informational message to view the generated report.
  3. To edit a report schedule:
    1. Select a report schedule.
    2. Click Edit.
      The Scheduled Reports wizard opens.
    3. Go through the wizard pages, making wanted changes and clicking Next, and then click Finish on the Summary page.
    4. Click View Report Schedule in the informational message to see the edited report listed in the Scheduled Reports page.
  4. To clone a report schedule:
    1. Select a report schedule.
    2. Click Duplicate.
      The Scheduled Reports wizard opens.
    3. Enter a different report name in the first wizard page, continue through the wizard pages optionally making any wanted changes and clicking Next, and then click Generate on the Summary page.
      NOTE: If you do not use a different report name in the first wizard page, the operation fails.
    4. Click View Report Schedule in the informational message to see the cloned schedule listed in the Scheduled Reports page.
  5. To delete a report schedule:
    1. Select a report schedule.
    2. Click Delete.
    3. Click Delete to confirm that you want to delete the report.
      An informational message confirms that the report schedule has been deleted.
  6. To manage or see more information:
    1. Click to sort the information in each column.
    2. Click Clear Filters to remove all filters or click X next to a specific filter to remove that filter.
    3. Click to show or hide columns on the page.
    4. Click a row to display details about the report, such as the creation date, creator, modification date, delivery configuration and so on. To close the Details pane, click .
  7. To disable a report schedule so that it does not run a report, swipe left on the slider under the Enabled column.
    An informational message confirms that the report schedule has been disabled.
    The Next Run column no longer shows a date on which the report is scheduled to run. Swipe right on the slider to reenable the report schedule and to see on which date the report is scheduled to run. An informational message confirms that the report schedule has been enabled.

Rate this content

Accurate
Useful
Easy to understand
Was this article helpful?
0/3000 characters
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please provide ratings (1-5 stars).
  Please select whether the article was helpful or not.
  Comments cannot contain these special characters: <>()\