メイン コンテンツに進む
  • すばやく簡単にご注文が可能
  • 注文内容の表示、配送状況をトラック
  • 会員限定の特典や割引のご利用
  • 製品リストの作成とアクセスが可能
  • 「Company Administration(会社情報の管理)」では、お使いのDell EMCのサイトや製品、製品レベルでのコンタクト先に関する情報を管理できます。

Dell EMC SmartFabric OS10 User Guide Release 10.5.0

PDF

Configure Layer 2 uplink

To connect with another L2 network, create a L2 uplink and associate a network with the uplink. To do so:

  1. Launch the Create Uplink for External Network Connectivity wizard.
  2. Select the Uplink Connectivity as Layer 2.
    NOTE L2 uplinks are created only on leaf switches.
  3. Create a L2 uplink by providing the name and description, and click NEXT.
  4. Select a rack and an interface or interfaces from the leaf switches to associate to the uplinks.
    NOTE The list shows only the available interfaces including breakout interfaces.
  5. Select the static or dynamic LAG based on the configuration setup in the external network, and click NEXT.
    NOTE To form a LAG on the leaf switches, select an interface or interfaces that are of the same speed.
  6. Associate the networks with the selected interfaces:
    • Add multiple tagged networks or a single untagged network, or both.
    • Add the network from the displayed list or create a general purpose network using the ADD NETWORK.

  7. Select Yes or No to integrate the networks that are created automatically in the fabric through vCenter, on this uplink.
  8. Click FINISH.

From the SFS GUI Network Profiles tab, you can view the list of all networks and virtual networks configured in the SFS. The page has NETWORKS and VIRTUAL NETWORKS tabs display the details of respective network profiles including the network name, description, network type. You can also delete a network profile from this tab. To delete a network profile, select a network profile from the list and click DELETE.


このコンテンツを評価する

正確
有益
分かりやすい
この記事は役に立ちましたか?
0/3000 characters
  1~5個の星の数で評価してください。
  1~5個の星の数で評価してください。
  1~5個の星の数で評価してください。
  この記事は役に立ちましたか?
  コメントでは、以下の特殊文字は利用できません: <>()\